Case Study

Point Condition Monitor - Sphero Lock Barrel and Drop Lug Alignment.

A point machine (PM) is used to move a railway track to divert trains onto a desired track. The Miro PCM-Electric (PCM-E) is a system designed to monitor the performance of a PM. See Fig. 1.

An AC single phase or DC motor drives the mechanism that moves the rails. See Fig. 2. Once the rails have reached the desired position, the motor stops. The PCM-E continuously measures the voltage and current of the motor and derives performance metrics.

A reference operation is determined after the PCM-E undergoes a thirty-operation training phase. Every subsequent operation is then compared to the reference operation and is classified as ‘Good’, ‘Possible Issue’ or ‘Critical’ to indicate the severity of the operation. The user can configure the system to send alerts and alarms, based on the severity level.

The PCM-E provides real-time insights into point operations, detects impending failures and notifies maintenance crews via emails or SCADA alerts. This enables proactive remedial action to be taken, before a catastrophic failure causes disruption of services, impacting the rail network and customers. This results in improved reliability, cost savings, and increased customer goodwill.

The metrics captured by the PCM-E allows network operators to transition from a periodic based maintenance to condition based maintenance, not only reducing operational costs, but also helping operators manage track access and downtime.

A proprietary database solution, AsMoSys (Asset Monitoring System) is used to import, view and manage PCM data, including emailing notifications.

This case study illustrates the misalignment of the sphero lock barrel and drop lug and subsequent resolution.

Sphero Lock Barrel and Drop Lug Misalignment

The sphero lock barrel and drop lug is a mechanism that holds the point switchblades in place. See Fig. 3.

On 18th July 2022 06:53 hrs, the PCM-E at Site 756 detected an operation with an unusual ‘bump’ in the current around a third of the way through the run section. With the run current exceeding the upper limit, the operation was classified as a ‘Possible Issue’. See Figure 4 below.

Figure 5 shows the point operation in the AsMoSys event list with the ‘Possible Issue’ classification.

For the next 13 hours, the bump continued to increase. Since the operations completed within the run-time limit, these run current exceedance events therefore remained classified as ‘Possible Issue’. See Fig. 6

Figure – PCM-E Point operation graph at 18-07-2022 20:03

Finally at 00:17 hrs on the 19th July 2022, 17 hours after the first ‘Possible Issue’ event, the run current exceeded the clutch limit, causing the clutch to slip and the run time to exceed the run-time threshold and was then classified as a ‘Critical’ event. Figure 7 below shows the point operation graph for this ‘Critical’ Event. The point operation was still completed, but took an additional 0.5secs.

A maintenance crew attended site at 10:00 hrs and performed remedial work. However, the AsMoSys PCM system continued to generate ‘Critical’ alerts. The maintenance crew returned at 17:00 hrs and found that the sphero lock barrel and drop lug was bound over to the right of the switch bracket .

This failure and subsequent resolution can be catalogued in AsMoSys for future reference for all users, who can then quickly attend to the fault and resolve it,

After realignment, the point machine returned to normal ‘Good’ operation at 17:15 hrs. The point operation following the reallignment is shown in Figure 8.

Figure – PCM-E Point operation graph at 19-07-2022 17:15.

This case study is an example of the PCM-E preventing a complete point failure and subsequent disruption of rail services.

Following the failure analysis for this event, an additional classification called ‘Warning’ (that sits between ‘Possible Issue’ and ‘Critical’ in severity) was introduced to alert users to this specific failure mode.

The ‘Warning’ classification can be developed for other specific failure modes, enabling users to quickly identify issues and carry out remedial work.