Case Study

Points Condition Monitor – Motor Capacitor High Resistance

A point machine (PM) is used to move a railway track to divert trains onto a desired track. The Miro PCM-Electric (PCM-E) is a system designed to monitor the performance of a PM. See Fig. 1.

An AC single phase or DC motor drives the mechanism that moves the rails. See Fig. 2. Once the rails have reached the desired position, the motor stops. The PCM-E continuously measures the voltage and current of the motor and derives performance metrics.

A reference operation is determined after the PCM-E undergoes a thirty-operation training phase. Every subsequent operation is then compared to the reference operation and is classified as ‘Good’, ‘Possible Issue’ or ‘Critical’ to indicate the severity of the operation. The user can configure the system to send alerts and alarms, based on the severity level.

The PCM-E provides real-time insights into point operations, detects impending failures and notifies maintenance crews via emails or SCADA alerts. This enables proactive remedial action to be taken, before a catastrophic failure causes disruption of services, impacting the rail network and customers. This results in improved reliability, cost savings, and increased customer goodwill.

The metrics captured by the PCM-E allows network operators to transition from a periodic based maintenance to condition based maintenance, not only reducing operational costs, but also helping operators manage track access and downtime.

A proprietary database solution, AsMoSys (Asset Monitoring System) is used to import, view and manage PCM data, including emailing notifications.

This case study illustrates how the PCM-E helped identify a motor capacitor with high resistance contacts, and subsequent resolution.

Motor Capacitor High Resistance Failure

Single phase AC motors need capacitors to create a rotating magnetic field by shifting the phase of the current in the motor windings, allowing the motor to start and run smoothly

On 1st December 2020 19:34 hrs, the PCM-E at Site 814 detected a “Possible Issue” event. See Fig. 2. The event was classified “Possible Issue’ due to the A-Normal run current exceeding the run current deviation threshold. See Fig. 3.

Figure – PCM-E Point operation Event List at 01-12-2020 19:34

Figure 4 shows the Points operation graph. The run current has unusual current spikes that exceed the run current deviation limits.

Figure 5, shows a similar point operation occurred when the point operated in the reverse direction on the 2nd December 2020 at 19:28 hrs.

Figure – PCM-E Points operation graph at 02-12-2020 19:28

The end of a point operation is determined by the run current falling below the end run current threshold. The next point operation at 19:30:41 was classified as a “Critical” event due to the spikes being significant enough to fall below the end run current threshold and PCM detecting the points operation finishing too early (lasting only 0.5 seconds). Although the point operation completed, the PCM metrics were outside the normal or reference operating limits. Figure 6 below shows the multi-parameter capture for this operation. The multi-parameter captures Voltage, Current, Power and Power Factor graphs for a 10 second period, allowing for more insights into what is occurring beyond the point operation.

Figure 7 shows the PCM point operation graph with the early completion due to the current spikes falling below the end current threshold.

Figure – PCM-E Points operation graph at 02-12-2020 19:30

Site 814 uses a M3A point machine where both the Normal and Reverse direction circuits share the same motor capacitors. On 3rd December the maintenance team investigated the point machine motor and re-terminated the lugs connecting the capacitors. The following point operations no longer showed the current spikes, confirming the intermittent loose contact of the lugs were the cause of the current spikes.

Figure 9 shows the point operation just after the repair. The Miro PCM system was able to provide alerts for this condition before the point machine failed, preventing disruption of rail services.