A point machine (PM) is used to move a railway track to divert trains onto a desired track. The Miro PCM-Electric (PCM-E) is a system designed to monitor the performance of a PM. See Fig. 1.
An AC single phase or DC motor drives the mechanism that moves the rails. See Fig. 2. Once the rails have reached the desired position, the motor stops. The PCM-E continuously measures the voltage and current of the motor and derives performance metrics.
A reference operation is determined after the PCM-E undergoes a thirty-operation training phase. Every subsequent operation is then compared to the reference operation and is classified as ‘Good’, ‘Possible Issue’ or ‘Critical’ to indicate the severity of the operation. The user can configure the system to send alerts and alarms, based on the severity level.
The PCM-E provides real-time insights into point operations, detects impending failures and notifies maintenance crews via emails or SCADA alerts. This enables proactive remedial action to be taken, before a catastrophic failure causes disruption of services, impacting the rail network and customers. This results in improved reliability, cost savings, and increased customer goodwill.
The metrics captured by the PCM-E allows network operators to transition from a periodic based maintenance to condition based maintenance, not only reducing operational costs, but also helping operators manage track access and downtime.
A proprietary database solution, AsMoSys (Asset Monitoring System) is used to import, view and manage PCM data, including emailing notifications.
This case study illustrates the benefits of the PCM to target maintenance and improve reliability.
On Sunday 22nd August, 2021, 53 points failed to Reverse with the Signaller making a number of attempts to get the points over. Review of the Points Conditioning Monitor (PCM) data, showed that the “B” end had failed as the switch was closing up to the stock rail and the points being locked. Note that prior to the failure, the monitor had not alarmed, but showed a “possible issue”.
53B points are a Tangential layout with Spherolock mounted on in-bearers and concrete sleepers. The machine is a Siemens 84M Mk III and the layout uses a double back-drive. Due to the camber of the road, when the points drive Reverse, there is a slight up hill drive for the machine.
The CHK Points Condition Monitors were installed in March of 2020. AsMoSys Event list for Site 53 22nd August is shown in Figure 3.
Figure – PCM-E Point operation Event List at 22-08-2021 11:04
Figure 4 shows the “Critical” point operation.
Figure – PCM-E Point operation graph at 22-08-2022 11:04
Figure 5 shows a previous operation at 10:48 showed the run current exceeding the run deviation upper limit. This operation was classified as “Possible Issue”.
Figure – PCM-E Point operation graph at 22-08-2022 10:48
Attending team found very little wrong with the points, so decided to re-lubricate the layout, including the Spherolock Central Unit. Figure 6 below showed improved operation once lubrication had taken effect.
Figure – PCM-E Point operation graph at 22-08-2022 12:03
AsMoSys allows users to plot trends over time. Figure 7 shows the average run current over time. This trend shows the points operation, particularly driving to Reverse, had degraded over the whole of the drive, during the previous months, so further remedial work was required.
Figure – PCM-E Point Operation Trend – Average run Current (April – October 2021)
The Major Works Signals gang attended and confirmed that the points were in good mechanical order, including the Back drive, so focus was then on the machine.
The first issue addressed was the 84M Brake. Previous investigations has identified an issue where low volts on the machine do not allow the brake to release properly due to the half wave rectifying circuit that is supplied in the machine. As the machine is approximately 500m from the Relay Room, the approved upgrade of replacing the rectifier with a full wave bridge rectifier was carried out. It was also noted during the Brake works, that the gears within the machine required re-greasing which was carried out by the Signals Maintenance team a few days later. The team were also instructed to replace the older “aluminium” rotor motor in the machine with the new “brass” rotor motor to offer further reliability improvement.
The combined reliability works from lubricating the Central Unit and machine gears, Brake improvements and brass motor have improved the operating characteristics of the machine and reliability of the points, particularly for the Reverse direction.
Figure 8 and Figure 9 shows point operations before and after all works.
Figure – PCM-E Point Operation Site 53B before all works
The point operation after the works is also following the PCM-E’s re-training. Figure 9 shows reduced starting inrush current reduced from 36A to 20A. The run current is also smoother with a noticeable decrease from over 7A to less than 6A. This trend can also be seen in the average run current trend shown in Figure 7.
Figure – PCM-E Point Operation Site 53B after all works
Reliable and quality Points Monitoring have also provided evidence to confirm that the works on the machine had a positive impact on the operation and reliability of the machine and subsequently reduced the risk of a possible significant disruption to the Rail Network.